Simplifying Design and Consent Management

At Consentus, we specialise in creating precise, professional drawings and documentation for small-scale building projects, ensuring you meet all local consent requirements. Skip the need for a costly architect and work directly with us to streamline the process. Our team is dedicated to providing clear, compliant documentation that brings your project to life efficiently and affordably. Whether it’s a renovation, extension, or a new build, Consentus is here to make your journey to building consent straightforward and stress-free.

4 Simple Steps to Get Your Council Consent:

Combined Shape
Assess

We start by assessing your project site and understanding the council's requirements. This helps ensure compliance from the get-go.

Combined Shape
Design

Work with us to create detailed, compliant drawings and plans. These will outline your project and meet council specifications.

Combined Shape
Submit

We submit your completed plans, along with any required documents, to the council for review.

Combined Shape
Approve

Once approved, your consent is issued, and you're ready to move forward with your project!

Project types

AdobeStock 731958406 LR

Require something a little more complex?

Our Professional Network Includes:
  • Structural Engineers: Expert advice for safe and compliant designs, including load-bearing structures and seismic considerations.
  • Builders: Skilled contractors ready to bring your project to life with precision and quality craftsmanship.
  • Plumbers: Reliable professionals for water systems, drainage, and specialised installations like pool plumbing.
  • Electricians: Licensed experts for safe electrical systems, from lighting your outdoor spaces to powering pool equipment.
  • Surveyors: Detailed site surveys to ensure your plans align with zoning requirements and property boundaries.
  • Landscape Architects: Creative professionals to design cohesive and stunning outdoor environments.
  • Geotechnical Experts: Analysis of soil and land conditions for complex builds on challenging sites.

FAQs

What is a building consent, and do I need one?

A building consent is council approval confirming your building work meets the Building Code. Most structural, plumbing, and drainage work needs one — including renovations, additions, and new structures. If you're unsure, we can quickly assess your project and let you know.

What does ConsentUs actually do?

We manage the full consent process for you — from initial assessment through to compliant drawings, documentation, council submission, and approval. You get one team handling the paperwork, not a confusing back-and-forth with council yourself.

How long does the consent process take?

Timelines vary by council and project complexity, but most straightforward residential consents take several weeks once submitted. We'll give you a realistic estimate for your specific project and council area during the assessment stage.

What areas/councils do you cover?

We cover all councils nationwide

Do I need consent for a bathroom or kitchen renovation?

Often, yes — particularly if you're moving plumbing, walls, or drainage. Even cosmetic-looking renovations can trigger consent requirements. We'll assess your plans and confirm exactly what's needed.

I'm building a granny flat/sleepout under 70m² — do I still need paperwork?

Yes. While structures under 70m² are often consent-exempt, council still requires compliant drawings and documentation confirming the build meets Building Code requirements. We prepare these for you even for exempt builds.

What's the difference between a minor dwelling and a granny flat?

These terms are often used interchangeably in NZ. Generally they refer to a smaller, self-contained secondary dwelling on the same site as your main home — used as a sleepout, studio, tiny home, or rental. Requirements depend on size, use, and your specific site — we'll clarify what applies to you.

Do additions and alterations need a full building consent?

In most cases, yes. Structural changes, extensions, and significant alterations typically require consent. We manage the design and documentation for these from start to finish.

Do I need consent for a swimming pool, pool house, or retaining wall?

Often yes — and pool fencing has strict, separate compliance requirements under NZ law regardless of pool size. Retaining walls over a certain height also typically require consent. We'll confirm exactly what applies to your project.

What's your process?

We follow four steps: Assess your project and requirements, Design compliant drawings and documentation, Submit to council on your behalf, and support you through to Approval.

What happens if my consent gets declined?

We help resolve council queries and resubmit as needed. Getting documentation right the first time significantly reduces the chance of delays or rejection.

Can you help if I've already started my project or hit a problem with council?

Yes — we regularly step in mid-project to resolve consent issues, missing documentation, or council pushback.


Need help with your next project? Contact us today to get started!

Let us take care of the details, so you can focus on what matters - your vision!

CONTACT US